Sign In | Join Free | My burrillandco.com
Home > Trestle Bridge >

ASTM GB Steel Emergency Bridge / steel Structure Bridge Traditional Style

Jiangsu Zhonghai Bridge Equipment Co.,LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap ASTM GB Steel Emergency Bridge / steel Structure Bridge Traditional Style from wholesalers
     
    Buy cheap ASTM GB Steel Emergency Bridge / steel Structure Bridge Traditional Style from wholesalers
    • Buy cheap ASTM GB Steel Emergency Bridge / steel Structure Bridge Traditional Style from wholesalers

    ASTM GB Steel Emergency Bridge / steel Structure Bridge Traditional Style

    Ask Lasest Price
    Brand Name : Zhonghai Bailey Bridge
    Model Number : CB200/CB321
    Certification : IS09001, CE
    Price : USD 95-450
    Payment Terms : L/C,D/P,T/T
    Supply Ability : 60000ton/year
    Delivery Time : 8-10 work days
    • Product Details
    • Company Profile

    ASTM GB Steel Emergency Bridge / steel Structure Bridge Traditional Style

    Steel Emergency Bridge/steel Structure Bridge


    Yes, Bailey bridges can be used for permanent structures. While they were initially designed for temporary and emergency use, many Bailey bridges have been adapted for long-term or permanent applications due to their durability and adaptability. Here are some key points that support their use as permanent structures:


    1. **Durability and Strength**:

    Bailey bridges are made from high-strength steel, which provides excellent durability and load-bearing capacity. With proper maintenance and corrosion-resistant materials, they can last for decades.


    2. **Adaptability**:

    The modular design of Bailey bridges allows for easy customization and reinforcement. Engineers can add more panels and supports to increase the bridge's strength and span, making it suitable for permanent use.


    3. **Real-World Examples**:

    There are numerous examples of Bailey bridges being used as permanent structures worldwide. For instance, the longest Bailey bridge, which was 788 meters (2,585 feet) long and spanned the Derwent River in Hobart, Australia, was in use from 1975 until 1977 when the permanent Tasman Bridge was completed. Additionally, in 2024, the Indian Army built a 190-foot Bailey bridge in the village of Mundakkai in Kerala, India, following a catastrophic landslide.


    4. **Maintenance and Upgrades**:

    With regular inspections and maintenance, Bailey bridges can remain in service for extended periods. This includes checking for signs of wear, rust, and structural integrity, as well as applying protective coatings to prevent corrosion.


    5. **Cost-Effectiveness**:

    Bailey bridges are cost-effective solutions for both temporary and permanent applications. Their modular components can be reused or repurposed, reducing long-term costs.

    In summary, while Bailey bridges are renowned for their rapid deployment and temporary use, they can also serve as permanent structures with the right design considerations and maintenance practices.



    Specifications:

    CB321(100) Truss Press Limited Table
    No.Lnternal ForceStructure Form
    Not Reinforced ModelReinforced Model
    SSDSTSDDRSSRDSRTSRDDR
    321(100)Standard Truss Moment(kN.m)788.21576.42246.43265.41687.533754809.46750
    321(100)Standard Truss Shear (kN)245.2490.5698.9490.5245.2490.5698.9490.5
    321 (100) Table of geometric characteristics of truss bridge(Half bridge)
    Type No.Geometric CharacteristicsStructure Form
    Not Reinforced ModelReinforced Model
    SSDSTSDDRSSRDSRTSRDDR
    321(100)Section properties(cm3)3578.57157.110735.614817.97699.115398.323097.430641.7
    321(100)Moment of inertia(cm4)250497.2500994.4751491.62148588.8577434.41154868.81732303.24596255.2
    ASTM GB Steel Emergency Bridge / steel Structure Bridge Traditional StyleASTM GB Steel Emergency Bridge / steel Structure Bridge Traditional StyleASTM GB Steel Emergency Bridge / steel Structure Bridge Traditional StyleASTM GB Steel Emergency Bridge / steel Structure Bridge Traditional Style

    ​​

    CB200 Truss Press Limited Table
    NO.Internal ForceStructure Form
    Not Reinforced ModelReinforced Model
    SSDSTSQSSSRDSRTSRQSR
    200Standard Truss Moment(kN.m)1034.32027.22978.83930.32165.44244.26236.48228.6
    200Standard Truss Shear (kN)222.1435.3639.6843.9222.1435.3639.6843.9
    201High Bending Truss Moment(kN.m)1593.23122.84585.56054.33335.86538.29607.112676.1
    202High Bending Truss Shear(kN)3486961044139234869610441392
    203Shear Force of Super High Shear Truss(kN)509.8999.21468.21937.2509.8999.21468.21937.2
    ASTM GB Steel Emergency Bridge / steel Structure Bridge Traditional StyleASTM GB Steel Emergency Bridge / steel Structure Bridge Traditional StyleASTM GB Steel Emergency Bridge / steel Structure Bridge Traditional StyleASTM GB Steel Emergency Bridge / steel Structure Bridge Traditional Style

    ​​

    CB200 Table of Geometric Characteristics of Truss Bridge(Half Bridge)
    StructureGeometric Characteristics
    Geometric CharacteristicsChord Area(cm2)Section Properties(cm3)Moment of Inertia(cm4)
    ssSS25.485437580174
    SSR50.96108751160348
    DSDS50.96108751160348
    DSR176.44163121740522
    DSR2101.92217502320696
    TSTS76.44163121740522
    TSR2127.4271852900870
    TSR3152.88326253481044
    QSQS101.92217502320696
    QSR3178.36380594061218
    QSR4203.84435004641392
    ASTM GB Steel Emergency Bridge / steel Structure Bridge Traditional StyleASTM GB Steel Emergency Bridge / steel Structure Bridge Traditional StyleASTM GB Steel Emergency Bridge / steel Structure Bridge Traditional StyleASTM GB Steel Emergency Bridge / steel Structure Bridge Traditional Style


    Advantage

    Possessing the features of simple structure,
    convenient transport, speedy erection
    easy disassembling,
    heavy loading capacity,
    great stability and long fatigue life
    being capable of an alternative span, loading capacity


    Quality ASTM GB Steel Emergency Bridge / steel Structure Bridge Traditional Style for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Jiangsu Zhonghai Bridge Equipment Co.,LTD
    *Subject:
    *Message:
    Characters Remaining: (0/3000)